§ 47-23.4. Beach building restriction line.  


Latest version.
  • All buildings and structures requiring a building permit shall have a setback of a minimum of one hundred (100) feet from the mean high water line of the Atlantic Ocean in the section of the beach bounded by the Port Everglades Inlet on the south and the north boundary line of the subdivision of Holiday Beach, PB 27, p. 39, public records of Broward County, Florida, and its extension, on the north. The mean high water line is defined in Section 47-2, Measurements.

(Ord. No. C-97-19, § 1(47-23.4), 6-18-97)