The lawful use of an existing building, structure, land or a proposed building, structure
or use of land which has received city approval through a building permit or other
development permit as provided in the ULDR that precedes the issuance of a building
permit, may continue although such use or proposed use does not conform to the provisions
of the ULDR when the nonconformity is the result of a taking or acquisition of property
by a governmental authority or other entity with eminent domain powers. An expansion
of or addition to such proposed or existing use is permitted in accordance with the
provisions of this section. If such nonconforming building, structure or use of land
is removed or the nonconforming use of such building, structure or land is discontinued
for a continuous period of one hundred and eighty (180) days, the provisions of Sec. 47-3.8 shall apply.
(Ord. No. C-97-19, § 1(47-3.9), 6-18-97)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');