§ 9-50. Plumbing permit fees.  


Latest version.
  • When application for a plumbing permit is approved and before a permit is issued, a fee shall be paid based on the following schedule.

    Minimum fee ..... $105.00

    plus 2.00 percent of construction value

    At time of application submittal acceptance, the fee will be $105.00 plus forty (40) percent of the job cost. The remaining sixty (60) percent will be collected at the time of plan review approval.

    Exception: At no time shall the permit fee exceed fifty (50) percent of the cost of material and labor required to complete the job. Proof of actual cost of material and labor shall be submitted to the building official for this exception to be granted.

    (1)

    Boilers/heaters/furnaces ..... $105.00

    plus 2.00 percent of construction value

    (2)

    Catch basin(replacement) ..... $105.00

    plus 2.00 percent of construction value

    (3)

    Drains ..... $105.00

    plus 2.00 percent of construction value

    (4)

    Backflow preventer ..... $105.00

    plus 2.00 percent of construction value

    (5)

    Fixtures ..... $105.00

    plus 2.00 percent of construction value

    (6)

    Gas (including bottled gas) ..... $105.00

    plus 2.00 percent of construction value

    (7)

    Lift stations ..... $105.00

    plus 2.00 percent of construction value

    (8)

    Manholes (new or replacements) ..... $105.00

    (9)

    Outlets. Roughing-in or plugged outlets for doctor, dentist and hospital sterilizers, autoclaves, autopsy tables and other fixtures, appurtenances or other appliances having water supply or waste outlet or both discharging into traps or safe waste pipes ..... $105.00

    plus 2.00 percent of construction value

    (10)

    Piping/repiping (gas, sanitary, etc.) ..... $105.00

    plus 2.00 percent of construction value

    (11)

    Collection systems ..... $105.00

    plus 2.00 percent of construction value

    (12)

    Sewer or septic tank connections, per each connection or capping ..... $105.00

    (13)

    Solar heating system and piping ..... $105.00

    (14)

    Pools, spas and fountains ..... $105.00

    plus 2.00 percent of construction value

    (15)

    Water heater ..... $40.00

    (16)

    Below grade permit ..... $105.00

    (17)

    Sprinkler system ..... $105.00

    plus 2.00 percent of construction value

    (18)

    Wells ..... $105.00 each

    (19)

    Temporary toilet for other than construction sites ..... $105.00

    plus 2.01 percent of construction value

    (20)

    Interior demolition ..... $105.00

( Ord. No. C-10-30, § 1, 9-21-10 ; Ord. No. C-18-38 , § 1, 11-6-18)