§ 9-49. Electrical permit fees.
When an application for an electrical permit is approved and before a permit is issued, a fee shall be paid based on the following schedule.
Minimum fee ..... $105.00
Exception: At no time shall the permit fee exceed fifty (50) percent of the cost of material and labor required to complete the job. Proof of actual cost of material and labor shall be submitted to the building official for this exception to be granted.
(1)
Air conditioning ..... 1.35 percent of construction value or no less than $105.00
(2)
Security/life safety (burglar alarm, fire alarm, access system) ..... $105.00
plus 0.90 percent of construction value
(3)
Energy management system ..... $105.00
plus 0.90 percent of construction value
(4)
Final, thirty-day temporary (power for testing new buildings) ..... $105.00
plus 0.90 percent of construction value
(5)
Generators each KVA up to five (5) ..... $105.00
plus 0.90 percent of construction value
(6)
Lighting ..... $105.00
plus 0.90 percent of construction value
(7)
Motors ..... $105.00
plus 0.90 percent of construction value
(8)
Outlets ..... $105.00
plus 0.90 percent of construction value
(9)
Panels ..... $105.00
plus 0.90 percent of construction value
(10)
Electric Services ..... $105.00
plus 0.90 percent of construction value
a.
Temporary service for construction
b.
New service two hundred (200) amps or less
Each additional one hundred (100) amps thereafter
c.
Service changes two hundred (200) amps or less
d.
Each additional one hundred (100) amps thereafter
e.
Temporary power for testing (thirty-day)
f.
Service repair
g.
Service inspection to restore power
(11)
Pools spas and fountains:
a.
Residential (includes light, pump, time clock, transformer) ..... $105.00
plus 0.90 percent of construction value
b.
Commercial (includes injectors and control wiring) ..... $105.00
plus 0.90 percent of construction value
c.
Demolition ..... $105.00
(12)
Low voltage systems ..... $105.00
plus 0.90 percent of construction value
(13)
Boat dock power pedestal, each ..... $105.00
(14)
Transformers replacement ..... $105.00
plus 0.90 percent of construction value
(15)
Central vacuum system ..... $105.00
plus 0.90 percent of construction value
(16)
Interior demolition ..... $105.00
(17)
Miscellaneous repair ..... $105.00
(18)
Solar electric photo voltaic system (PV system)
Single family residential ..... $105.00
Multifamily and commercial ..... $105.00
plus 0.90 percent of construction value
(19)
Signs ..... $105.00
plus 0.90 percent of construction value
( Ord. No. C-10-30, § 1, 9-21-10 ; Ord. No. C-18-38 , § 1, 11-6-18)