Where connections are to be made to existing building sewers, such building sewers
shall be carefully examined by televising equipment and inspected and certified by
a licensed plumber in the State of Florida and report supplied to the city's department
of sustainable development (DSD) and the public works department prior to issuance
of a plumbing permit to connect to the main sewer. If found in good condition and
free from infiltration, it may be connected to the main sewer from the building. If,
however, in the judgment of the city, the existing building sewer is not in good condition
or free from infiltration, it shall be replaced with an approved permit and approved
by the public works director or his designee before connection is made.